Proven PLM Results for Real Customers
From complex Windchill migrations to greenfield Teamcenter implementations — here's how we've delivered measurable outcomes for our clients.
Real Projects. Real Outcomes.
Teamcenter–Enterprise System Integration Using T4EA
An automotive components manufacturer was managing EBOM in Siemens Teamcenter and production BOMs in their Enterprise System independently, with engineers manually re-entering part data and BOM structures across both systems. The duplication caused frequent data mismatches, delayed engineering change propagation to manufacturing, and recurring reconciliation issues.
- Manual BOM re-entry between PLM and Enterprise System fully eliminated
- Engineering change propagation to Enterprise System reduced from days to hours
- Part master data consistency maintained across both systems in real time
- Integration deployed across 3 plants with a single centralized configuration
Greenfield Teamcenter Implementation for Industrial Equipment Manufacturer
A mid-size industrial equipment manufacturer had no PLM system — product data was managed in spreadsheets and file shares, causing release delays and version control issues.
- 40% reduction in engineering change cycle time
- Single source of truth for 25,000+ part numbers
- Real-time BOM synchronization with SAP
- Full audit trail for ISO 9001 compliance
On-Premises Teamcenter Migration to Microsoft Azure Cloud
An automotive components manufacturer was running Siemens Teamcenter on aging on-premises infrastructure with high maintenance overhead, limited scalability, and no disaster recovery capability. Leadership mandated a move to Azure cloud to reduce IT burden and enable remote engineering access.
- Full Teamcenter environment live on Azure within 8 weeks
- On-premises server infrastructure decommissioned, eliminating hardware refresh costs
- Remote engineering team access enabled across 3 global sites
- Automated Azure Backup delivering daily recovery points with 99.9% uptime SLA
Oracle to SQL Server Database Migration for Teamcenter Environment
A mid-size manufacturer running Siemens Teamcenter on Oracle Database faced escalating licensing costs and an upcoming Oracle support expiry. They needed to migrate their Teamcenter database to Microsoft SQL Server with zero data loss and minimal downtime.
- 100% data integrity confirmed through row-count and checksum reconciliation
- Teamcenter environment fully operational on SQL Server within planned downtime window
- Annual Oracle licensing cost eliminated
- Post-migration performance on par with legacy Oracle environment
Teamcenter Implementation for Precision Aerospace Tooling Manufacturer
A precision aerospace tooling manufacturer managing hundreds of complex jig and fixture designs across multiple programs had no centralized PLM system. Tool design data was scattered across shared drives, creating version conflicts, audit failures, and delays in tool qualification sign-off.
- All tool design data centralized — version conflicts eliminated
- Quality audit passed with full document traceability in Teamcenter
- Tool qualification cycle time reduced by 35%
- CATIA V5 CAD data automatically managed through Teamcenter integration
Windchill to Teamcenter Migration for Automotive Tier 1 Supplier
A Tier 1 automotive supplier needed to migrate 15 years of product data from PTC Windchill to Siemens Teamcenter after a corporate standardization mandate, with zero tolerance for data loss.
- 100% data fidelity confirmed by automated reconciliation
- Migration completed 2 weeks ahead of schedule
- 0 production incidents post-migration
- Team trained and productive within 1 week of go-live
Ready to Create Your Success Story?
Let's discuss how ADSPLM can deliver measurable outcomes for your PLM initiative.